Refine your search:     
Report No.
 - 
Search Results: Records 1-12 displayed on this page of 12
  • 1

Presentation/Publication Type

Initialising ...

Refine

Journal/Book Title

Initialising ...

Meeting title

Initialising ...

First Author

Initialising ...

Keyword

Initialising ...

Language

Initialising ...

Publication Year

Initialising ...

Held year of conference

Initialising ...

Save select records

JAEA Reports

Guideline and cautionary points for accelerator system maintenance

Ono, Ayato; Takayanagi, Tomohiro; Sugita, Moe; Ueno, Tomoaki*; Horino, Koki*; Yamamoto, Kazami; Kinsho, Michikazu

JAEA-Technology 2021-044, 53 Pages, 2022/03

JAEA-Technology-2021-044.pdf:43.7MB

The 3-GeV rapid cycling synchrotron of Japan Proton Accelerator Research Complex (J-PARC) uses a large number of electromagnet power supplies in order to manipulate a high-intensity beam of 1 MW. These devices have been specially developed to meet the requirement to achieve acceleration of the 1-MW proton beams. Because J-PARC has been in operation for 10 years, we have to replace many parts and equipments due to failures caused by age-related deterioration. J-PARC accelerator system supplies the beams for many users, and we have to recover it as soon as possible when a trouble occurs. Therefore, if the trouble can be prevented before it happens, reduction of the user beam time can be minimized. Furthermore, it enables us to reduce additional work for operators. Maintenance is important to keep the equipments in a normal state, and makes it possible to extend the life of the equipments by detecting and maintaining the faulty parts and the aged deterioration parts at an early stage. Since all the devices requires the maintenance, there are a wide variety of maintenance methods. Some works are carried out by the J-PARC members, and some are performed by outsourcing. Ensuring safety and protecting workers are the most important issues in maintenance work. Therefore, J-PARC has rules for safety work. All workers in J-PARC have to learn and follow the rules. In addition, various ideas are being considered to enable safe and efficient work by devising ingenuity in each work. We also elaborate various ideas and processes for safe and efficient work according to the individual work conditions. In this report, we summarize the guideline and cautionary points during maintenance based on the actual case of maintenance and inspection work of the horizontal shift bump electromagnet power supply.

JAEA Reports

Proposal of safe and secure maintenance method to realize long-term stable operation of electromagnet power supply

Ono, Ayato; Takayanagi, Tomohiro; Ueno, Tomoaki*; Horino, Koki*; Yamamoto, Kazami; Kinsho, Michikazu

JAEA-Technology 2021-005, 40 Pages, 2021/05

JAEA-Technology-2021-005.pdf:4.27MB

The 3-GeV rapid cycling synchrotron of Japan Proton Accelerator Research Complex (J-PARC) uses a large number of electromagnet power supplies in order to manipulate a high-intensity beam of 1 MW. These devices have been specially developed to meet the requirement to achieve acceleration of the 1-MW proton beams. State-of-the-art technologies are used to these devices. To achieve stable operation with few failures, and to prevent major troubles in the event of a failure, it is necessary to maintain the performance of the devices under the appropriate and accurate management strategy with an enough understanding of its characteristics. However, since the specification and function of each device is different respectively, and it is also produced by different manufacturer, we have to maintain adequately according to the structure, configuration and features of the apparatus. There are typically three major stages in the maintenance works. First, "Daily inspection" is constantly performed to monitor the status of the equipment during operation and check for any errors or abnormalities. Second, "Routine maintenance" is carried out weekly, monthly, or yearly to fix the errors, or to replace the parts that are deteriorated. Third, "Troubleshooting" is conducted to recover from sudden failures. In this report, we will introduce the specific contents of "Routine maintenance", "Daily inspection", and "trouble case" based on the experiences of the electromagnet power supply group. In particular, we will report the work management methods, including ideas for facilitating recovery work. We will also summarize the important points of a matter that does not depend on the configuration, structure, and characteristics of the equipment.

JAEA Reports

Verification of alternative dew point hygrometer for CV-LRT in Monju

Ichikawa, Shoichi; Chiba, Yusuke; Ono, Fumiyasu; Hatori, Masakazu; Kobayashi, Takanori; Uekura, Ryoichi; Hashiri, Nobuo*; Inuzuka, Taisuke*; Kitano, Hiroshi*; Abe, Hisashi*

JAEA-Research 2016-021, 32 Pages, 2017/02

JAEA-Research-2016-021.pdf:5.0MB

In order to reduce the influence on a plant schedule of the MONJU by the maintenance of dew point hygrometers, The JAEA examined a capacitance type dew point hygrometer as an alternative dew point hygrometer for a lithium-chloride type dew point hygrometer which had been used at the CV-LRT in the MONJU. As a result of comparing a capacitance type dew point hygrometer with a lithium-chloride type dew point hygrometer at the CV-LRT (Atmosphere: nitrogen, Testing time: 24 hours), there weren't significant difference between a capacitance type dew point hygrometer and a lithium-chloride type dew point hygrometer. As a result of comparing a capacitance dew point hygrometer with a high-mirror-surface type dew point hygrometer for long term verification (Atmosphere: air, Testing time: 24 months), the JAEA confirmed that a capacitance type dew point hygrometer satisfied the instrument specification ($$pm$$2.04$$^{circ}$$C) required by the JEAC4203-2008.

Journal Articles

Design study on Gas Turbine High Temperature Reactor (GTHTR300)

Kunitomi, Kazuhiko; Katanishi, Shoji; Takada, Shoji; Takizuka, Takakazu; Nakata, Tetsuo; Yan, X.; Takei, Masanobu; Kosugiyama, Shinichi; Shiozawa, Shusaku

Nihon Genshiryoku Gakkai Wabun Rombunshi, 1(4), p.352 - 360, 2002/12

no abstracts in English

Journal Articles

Development of laser cutting/welding system for remote maintenance of ITER manifold

Yamaoka, Hiroto*; Tsuchiya, Kazuyuki*; Awano, Toshihiko*; Oka, Kiyoshi

Ishikawajima Harima Giho, 42(5), p.260 - 264, 2002/09

no abstracts in English

JAEA Reports

Refinement of a system configration control program (II); Development of the database function for cutsets of accident sequences and enhancement of GUI

*; *; *

JNC TJ9440 2000-003, 173 Pages, 1999/03

JNC-TJ9440-2000-003.pdf:19.86MB

In FY 1997, a program which evaluates the risk in each phase of the maintenance was developed to support the maintenance planning on an FBR plant. In FY 1998, the GUI (Graphical User Interface) of the program developed in FY 1997 was enhanced for its user-friendlyness including facilitation of data settings and interpretation of the computational results. Specifically, following functions were incorporated : (1)To call associated window displays (editing and reporting display) mutually. (2)To edit the combinations of the systems for their maintenance scheduling. Furthermore, some risk evaluation functions such as the database function for cutsets of accident sequences and tracking function of risk trends were developed and added to its analysis module. A series of test on the programs with the GUI and the analysis module was performed and it was verified that the progam worked correctly.

Journal Articles

Streaming analysis for radiation through ITER mid-plane port

Sato, Satoshi; Takatsu, Hideyuki; *; Iida, Hiromasa; Mori, Seiji*; R.Santoro*

Fusion Engineering and Design, 42, p.213 - 219, 1998/00

 Times Cited Count:1 Percentile:15.02(Nuclear Science & Technology)

no abstracts in English

Journal Articles

Status report on the JAERI AVF cyclotron

Okumura, Susumu; Fukuda, Mitsuhiro; Yokota, Wataru; Arakawa, Kazuo; Nakamura, Yoshiteru; Nara, Takayuki; Agematsu, Takashi; Ishibori, Ikuo; Tamura, Hiroyuki

Proc. of 11th Symp. on Accelerator Sci. and Technol., p.338 - 340, 1997/00

no abstracts in English

JAEA Reports

Development of maintenance engineering system

JAERI-Research 95-026, 54 Pages, 1995/03

JAERI-Research-95-026.pdf:2.47MB

no abstracts in English

JAEA Reports

None

PNC TJ1545 94-001, 82 Pages, 1994/03

PNC-TJ1545-94-001.pdf:3.81MB

no abstracts in English

JAEA Reports

None

; ; ; ;

PNC TN8410 92-074, 133 Pages, 1992/04

PNC-TN8410-92-074.pdf:3.8MB

None

Oral presentation

12 (Records 1-12 displayed on this page)
  • 1